770.932.7718

CDC  
Southern Wall Systems was contacted by Mulkey Enterprises to install 20,000 S/F of exterior Cementious coatings at CDC 107. The exterior access proved to be a real challenge for SWS with all the Cantilevered Concrete beams on the project. Southern Wall Systems also completed 3,000 S/F of Acoustical Plaster inside the main entrance of the building.